Tag Archives: depozitář

Reconstruction of Depository of National Library of CZ in Prague-Hostivař

In 2015 we have started working out the revision for detailed design for reconstruction of depository on National Library in Prague – Hostivař. Now we had passed successful formal approval.

Depository of National Library in Hostivař is unique building built in 90’s of the last century by reconstruction and extension of exhibition hall from 60’s. In original exhibitions hall is now placed main depository, using maximal occupancy of the space by placing in three-stored shelves.

Construction is divided in each store into six independent main parts. Of three side of perimeter are situated administration offices, operational are and restoration workshops, which are divided from depository itself by communication hallway.

In basement are place technological rooms of object, vacuum chamber, storages, workshops for reconstruction of microfilms. In extension of the roof and the attic is situated engine room with air-conditions.

Together with colleague Václav Morava we have led designing works for reconstruction of technological equipment, due to achieve required climate parameters for storing books and microfilms. We have worked out documents for reconstruction a exchange of old installations of technological devices of buildings, electro installations and coordination systems due to its lifespan and agreement with valid legislative. Not at last we have also worked on disposal changes in objects, reflecting to current needs of depository.

David Blatecký

NFA opened new depository premises for storing film material

Attended by the Minister of Culture Daniel Herman, the governor Central Bohemian Region Jaroslava Jermanová Pokorná and the NFA CEO Michal Bregant, the new depository of the National Film Archive (NFA) saw its opening ceremony.

The new, technologically advanced building, located in the Hradištko municipality in the Central Bohemia Region, will provide a perfect environment for long-term storage of film material. The depository space and its technical equipment ensure the ideal temperature of -5°C and a relative humidity of 35%. These values were chosen as the optimum values for the protection of film materials and for ensuring their service life of up to 400 years.

Our company participated in the depository project, worth CZK 155 million, as the chief designer and the design was prepared by Ing. arch Martin Kotík. The new depository project was funded under the Programme “Care for the National Cultural Treasure” of the Ministry of Culture of the Czech Republic.